Blomberg DW25502SS Instalační manuál Strana 6

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 25
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 5
3
USA
2. TOOLS WHICH MAY BE NEEDED
3. MATERIALS WHICH MAY BE NEEDED
(Additional materials may be required to comply with local codes)
Hot Water Supply Line - Minimum 3/8” O.D. copper tubing or metal braided
dishwasher supply line.
90° elbow with 3/8” N.P.T. male threads on one leg, and sized to fit your
water supply line (copper tubing/compression fitting, or braided hose) on
the other leg.
UL listed conduit connector or strain relief.
Teon tape or other pipe thread compound to seal plumbing connections.
Shut-off valve and fittings appropriate for hot water supply line (copper
tubing/compression fitting, or braided hose).
Silicone
Glue
Zobrazit stránku 5
1 2 3 4 5 6 7 8 9 10 11 ... 24 25

Komentáře k této Příručce

Žádné komentáře